Follow the climate impact — while construction is ongoing
Log in once a month and see if the project stays within the limit. If you spot an unfavorable trend, you can act in time.
Bring the entire project team together
Invite advisor and contractors. Assign roles. Everyone works in the same platform — you have the overview of who contributes what.
Building owner
EjerFull visibility and overview of the entire project
Advisor
RådgiverReviews and verifies data
Contractor
MedlemAdds emission data
Subcontractor
BidragsyderContributes specific data
Frequently asked questions
The building owner is responsible for delivering climate documentation at project completion, per BR18 §297-298. Without documentation, an occupancy permit cannot be issued. In practice, the task is typically delegated to the advisor, but the legal responsibility lies with the owner.
The current limit is 1.5 kg CO₂e/m²/yr for the total construction process (A4 transport + A5 construction site). The limit tightens to 1.3 in 2027 and 1.1 in 2029. A45 shows your consumption against the limit in real time.
Without complete A4-A5 documentation, the building cannot be occupied. The documentation must reflect the actual construction (as built) and cannot be handled at the last minute — making continuous data collection from day one essential.
Yes. A45 gives you continuous oversight of A4+A5 consumption against the limit. Contractors and advisors add data directly, and you can log in to check status at any time — without waiting for reports.
You can invite them directly from the platform — they create a free account and contribute data to your project. Alternatively, you or your advisor can enter their data manually. The platform is designed to work regardless of who owns the process.
Yes. Your dashboard gives you an overview of all active projects with compliance status, consumption against the limit, and team activity. You immediately see which projects are on track — and which need attention.