A45
For contractors

Take control of construction climate documentation

The platform guides you step by step through A4-A5 — transport, energy, and waste. Invite your subcontractors, and track consumption against the limit.

BR18-verified · Table 8, 10, 11 · All calculation methods included

app.a45.dk/project/emissions

PROJEKT

Nyt Kontorbyggeri Øst

Overholder krav

A4 TRANSPORT

0,42

A5 BYGGEPLADS

0,31

TOTAL

0,73

FORBRUG MOD GRÆNSE49%
0,73 kg CO₂e/m²/år1,50
New requirements

The construction process now has its own limit

Since July 2025, A4-A5 has a standalone limit of 1.5 kg CO₂e/m²/yr. Here is what you need to document.

Applies to all buildings where a building permit was applied for after 1 July 2025.

A4 — Transport

Material transport

Building materials from supplier or manufacturer to the construction site — documented via fuel, distance, or standard values.

Equipment transport

Machinery, scaffolding, and other equipment transported to and from the construction site.

A5 — Construction site

On-site energy use

Electricity, heating, and diesel from machinery over 1 ton and temporary installations like site offices and lighting.

Waste documentation

Waste quantities across BR18's 15 fractions — from concrete and brick to mixed construction waste.

Waste transport

Removal of construction waste from the site to receiving facilities or landfill.

Soil transport

Removal of surplus soil and contaminated soil from the construction site.

Step by step

The platform guides you all the way

01

Create project

Enter reference area and building type. The platform sets up the correct BR18 limits automatically.

02

Add emissions

The platform asks for exactly the right data — transport distance, fuel consumption, waste quantities. No guesswork.

03

Invite subcontractors

Subcontractors contribute their portion of data directly in the platform. You keep the overview.

04

Track consumption

Track consumption against the limit continuously. Generate BR18 report at completion.

AI-assisted

Upload invoices — AI helps extract data

Scan invoices and delivery notes. The AI suggests values, you review and approve. You always have full control over data.

01

Upload invoice or delivery note

02

AI suggests values and method

03

You review and approve

04

Emission recorded in the project

You can also enter everything manually — the platform guides you regardless.

Faktura
Beton C25/3012.400 kg
Transport: Viborg → Aarhus68 km
Diesel lastbil45 L
AI-udtrukket
MaterialeBeton C25/30
MetodeA4.2 — Afstandsbaseret
CO₂-eq0.024 kg/m²/år
Konfidens: 94%
Coordination

Bring all parties into one project

Whether you're a general contractor or main contractor — invite subcontractors and advisors to contribute directly. Assign roles, see who contributed, and keep track of everything.

Main contractor

OWNER

Full access to all data and reports

Subcontractor

BIDRAGYDER

Can add own data in the assigned project

app.a45.dk/projekt/team
Projektteam
MH
Martin Hansen
Hovedentrepr.
Ejer
PL
Peter Larsen
VVS Install.
Bidragyder
AN
Anne Nielsen
El-entreprise
Bidragyder
Invitér underentreprenør
Compliance

Track the limit continuously

No surprises at completion. You always know where the project stands.

Track the limit continuously
FAQ

Frequently asked questions

You need to document transport of building materials and equipment (A4) and on-site energy use, including machinery over 1 ton, temporary facilities, and waste handling (A5). The combined limit is 1.5 kg CO₂e/m²/yr.

Upload an invoice or delivery note, and the AI suggests values such as weight, distance, fuel, and calculation method. You review and approve everything before it is recorded. You can also enter all data manually if you prefer.

Yes. Invite subcontractors to the project and assign roles. They add their own emissions directly, and you keep the overview of who contributed what. No extra per-user fees.

The 1.5 kg CO₂e/m²/yr limit applies to all buildings where a building permit was applied for after 1 July 2025. The limit tightens to 1.3 in 2027 and 1.1 in 2029. Documentation must be submitted with the completion notice.

No. The platform guides you step by step and automatically suggests the right calculation method based on your data. You don't need to know Table 8, 10, or 11 — A45 navigates the regulations for you.

It depends on project size, but most emissions take under 2 minutes to register with AI scanning. For a typical construction project with 50-100 invoices, you easily save 1-2 weeks of manual work compared to spreadsheets.

Get started

Ready to get started?

Try A45 for free and see how the platform can simplify your climate documentation.

14-day free trial · Full functionality · Founding Member benefits